G99 Protection Panels

Mains-protection relay panels for DNO compliance — built, tested and ready for witness testing.

Connecting generation to the network — solar, battery storage, CHP or standby plant running in parallel — means satisfying your DNO under Engineering Recommendation G99. ENICO builds the protection panel that gets you there: a protection relay configured to the settings in your connection agreement, wired to a shunt-trip device that disconnects your generation when the network needs it to.

We build standard G99 panels for the repeatable jobs and bespoke panels for the big ones — including systems up to 10 MW and distributed, multi-generator schemes — and we support commissioning so the DNO witness test goes smoothly the first time.

What's included

  • Protection relay configured to your connection agreement

    Loss-of-mains, over/under voltage and over/under frequency protection set to the values your DNO has specified, recorded on a settings sheet in the documentation pack.

  • Tripping and interlocking arrangements

    Shunt-trip or undervoltage-release tripping of your nominated circuit breaker, with status indication and volt-free contacts for your control system.

  • Standard panels for smaller generation

    Compact, repeatable G99 relay panels for small solar and battery installations — quick to price, quick to deliver, familiar to DNO engineers.

  • Engineered panels for larger sites

    Bespoke protection panels for larger or multi-generator sites, including CT/VT metering arrangements and integration into existing switchboards.

  • Commissioning and witness-test support

    Relay settings applied and injection-tested before dispatch, with support on the day of the DNO witness test if you need it.

Capability at a glance

G99 Protection Panels — capability summary
ComplianceEngineering Recommendation G99 (DNO connection requirements)
ApplicationsSolar PV, battery storage, CHP, generators in parallel with the mains
Protection functionsLoss of mains, U/O voltage, U/O frequency, per your connection agreement
Track recordSystems up to 10 MW, including distributed multi-generator schemes
TestingSettings applied and secondary-injection tested before dispatch
DocumentationSettings record, schematics and test certificate — QR-linked on the panel

Common questions

Do I need a G99 panel?

If your generation runs in parallel with the grid — even briefly during changeover — your DNO will require G99 protection appropriate to the size of the installation. Your connection offer or agreement will state the protection settings required; send it to us and we will quote the panel to match.

What happens at a DNO witness test?

The DNO's engineer watches the protection operate at the agreed settings — typically by secondary injection into the relay — and sees the generation disconnect. Our panels arrive pre-tested with the settings applied, and we can attend site to run the injection test with the DNO present.

How quickly can you deliver a G99 panel?

Standard panels for smaller installations are a stocked, repeatable build — ask for current lead times when you enquire. Engineered panels depend on relay availability and complexity; we confirm a delivery date with the quotation.

Pricing a g99 protection job?

Send whatever you have — a drawing, a spec, or a description of the problem — and we'll come back with a straight quotation: standard panels in hours, complex projects priced properly.